Changes

Jump to navigation Jump to search
Line 105: Line 105:     
More complex tests, with abrupt changes in rate and BHP, are more readily analyzed with computer reservoir simulators. These simulators are used to history-match production data to obtain a reservoir description, which is then used to obtain a long-term production forecast and thus to estimate reserves. [[:file:pressure-transient-testing_fig8.png|Figure 8]] shows an example of a history match of production data and a forecast of future performance of the well using the reservoir description obtained from the history match.
 
More complex tests, with abrupt changes in rate and BHP, are more readily analyzed with computer reservoir simulators. These simulators are used to history-match production data to obtain a reservoir description, which is then used to obtain a long-term production forecast and thus to estimate reserves. [[:file:pressure-transient-testing_fig8.png|Figure 8]] shows an example of a history match of production data and a forecast of future performance of the well using the reservoir description obtained from the history match.
  −
[[file:pressure-transient-testing_fig9.png|left|thumb|{{figure number|9}}Active and observation wells in an interference pulse test.<ref name=pt09r7>Earlougher, R. C., Jr., 1977, Advances in Well Test Analysis: Dallas, TX, American Institute of Mining, Metallurgical and Petroleum Engineers, Society of Petroleum Engineer's Monograph 5, 264 p.</ref>]]
      
==Interference and pulse tests==
 
==Interference and pulse tests==

Navigation menu