Search results

Jump to navigation Jump to search
Results 1 – 9 of 9
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  • ...nvergence between the two landmasses persists today at a rate of 2&nbsp;cm/yr.<ref name=Murphy2014 /> The obliquity of plate convergence increases toward | Western || ~10&nbsp;mm/yr Northward || ~20&nbsp;mm/yr Westward
    13 KB (1,732 words) - 22:01, 23 January 2019
  • | Peak Oil Production (bo/d, Yr) || [[:file:Figure3Bakken2019-20CommRpt.jpg|Figure 3]] | Peak Gas Production (mmcf/d, Yr) || [[:file:Figure3Bakken2019-20CommRpt.jpg|Figure 3]]
    11 KB (1,595 words) - 20:20, 2 June 2021
  • ...ltra-slow [[spreading ridge]] with a slow spreading rate of about 12-18 mm/yr, acts as the southern boundary.<ref name=Saria /><ref name=H-J2005 /> This ...actual plate boundaries. Velocity predicted at this boundary is 1.3-1.4 mm/yr. This boundary separates Lwandle from the Somali Plate.<ref name=Demetsetal
    10 KB (1,574 words) - 16:51, 6 April 2016
  • ...om fractured Monterey Shale, for example, have had ongoing long-term (100+ yr) production. The paradigm shift in the new millennium is the pursuit of tig ...these unconventional shale-gas reservoir systems mostly during the last 10 yr in principal, although Mitchell's effort began much earlier. In 1982, drill
    73 KB (10,728 words) - 18:16, 11 January 2024
  • ...nt improvements in drilling and completion technologies within the past 20 yr, continued advances in technologies are essential to tap the very large gas
    34 KB (5,070 words) - 15:11, 23 August 2016
  • ...ro.org/conference-paper/SPE-50392-MS SPE Paper 50392], 3 p.</ref> After 30 yr of production from one of the reservoir units, the sweep efficiency is only
    32 KB (4,727 words) - 21:03, 15 January 2024
  • ...ith oil stored in open-fractured shale have been pursued for more than 100 yr, organic-rich and low-permeability shales and hybrid shale-oil systems are ...forated over the entire Monterey Shale interval and did produce during a 5 yr period 2.60 times 104 m3 (163,603 bbl) of oil, 6.369 times 106 m3 (224,936
    97 KB (14,873 words) - 19:53, 11 January 2024
  • ...dstone target led to the bypassing of the Marcellus Shale for more than 70 yr. ...el, was the first new oil and gas well drilled in Susquehanna County in 34 yr and was the fifth well ever drilled in that county. It reported a maximum p
    89 KB (13,415 words) - 19:16, 16 January 2024
  • ...e depositional-dip-oriented cross section showing water saturation after 5 yr of production where water has been injected down the depositional dip, from ...ater injection were set to maintain a group target production rate over 20 yr of 175 S m<sup>3</sup>/day (1100 bbl/day), a minimum bottom hole pressure c
    113 KB (16,689 words) - 22:11, 15 January 2024