Search results

Jump to navigation Jump to search
Results 1 – 5 of 5
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  • ...\rm s} + \mbox{D}_{\rm f} \left(\mbox{BHT} - \frac{\mbox{T}_{\rm s}}{\mbox{TD}}\right)</math> #*::: TD = total depth (BHT and TD must be from the same log run) (ft)
    5 KB (714 words) - 15:19, 13 September 2022
  • ...x{T}_{\rm s} + \mbox{D}_{\rm f} \frac{\mbox{BHT} - \mbox{T}_{\rm s}}{\mbox{TD}}</math> * TD = total depth (make sure BHT and TD are from same log run)
    6 KB (1,027 words) - 16:40, 5 April 2022
  • * Anticipated total depth (TD) in measured depth (MD) and TVD (true vertical depth)
    6 KB (779 words) - 15:09, 24 January 2022
  • ;TD:total depth
    5 KB (840 words) - 13:51, 18 March 2019
  • ...tion will come to a stop. The end of the well is called the total depth or TD for short. At this point, the drill pipe is pulled out and wireline logs ma
    15 KB (2,385 words) - 15:05, 1 August 2016