Search results
Jump to navigation
Jump to search
- ...hould develop the field knowledge and confidence necessary to lead a quick tour of the key locations of the area. If such a tour isn't possible, consider making a well-narrated video in the field to empha5 KB (771 words) - 21:12, 1 February 2022
- ...ting shifts, ensuring continuous monitoring of wellsite activities. The on-tour logger catches, prepares, and analyses the drill cuttings and records this ...ses are run, an additional logger or sample catcher is often added to each tour.8 KB (1,031 words) - 15:27, 24 January 2022
- ...mudlogger is responsible for plotting the data acquired during his or her tour. In this way, the mudlog becomes an accurate and up-to-date record of nearl5 KB (752 words) - 15:39, 24 January 2022
- ...nterval can be increased or an additional mudlogger can be assigned to the tour. Also, it is not unreasonable to request that the drill rate be slowed so t10 KB (1,482 words) - 15:25, 24 January 2022
- ...equipment, a complete system check and calibration is recommended on each tour.18 KB (2,670 words) - 18:21, 21 January 2022