File:Drill-stem-testing fig3.png
Jump to navigation
Jump to search
Drill-stem-testing_fig3.png (748 × 570 pixels, file size: 5 KB, MIME type: image/png)
Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 22:25, 14 January 2014 | 748 × 570 (5 KB) | Importer (talk | contribs) | Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole. Category:Wellsite methods |
You cannot overwrite this file.
File usage
The following page uses this file: