File:Drill-stem-testing fig3.png

From AAPG Wiki
Jump to navigation Jump to search

Drill-stem-testing_fig3.png(748 × 570 pixels, file size: 5 KB, MIME type: image/png)

Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current22:25, 14 January 2014Thumbnail for version as of 22:25, 14 January 2014748 × 570 (5 KB)Importer (talk | contribs)Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole. Category:Wellsite methods

The following page uses this file:

Metadata