Kickoff point
Jump to navigation
Jump to search
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.
This article is a stub. You can help AAPG Wiki by expanding it.