Kickoff point

From AAPG Wiki
Jump to navigation Jump to search

The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.

Simple vertical profile of a horizontal well, illustrating basic terms.

This article is a stub. You can help AAPG Wiki by expanding it.

See also

External links

find literature about
Kickoff point