Kickoff point

From AAPG Wiki
Revision as of 21:16, 15 March 2016 by Cwhitehurst (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Horizontal Wells: Focus on the Reservoir
Series Methods in Exploration No. 14
Chapter Introduction
Author Timothy R. Carr, Erik P. Mason, Charles T Feazel
Link Web page
Store AAPG Store

The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.

Simple vertical profile of a horizontal well, illustrating basic terms.

This article is a stub. You can help AAPG Wiki by expanding it.

See also

External links

find literature about
Kickoff point
Datapages button.png GeoScienceWorld button.png OnePetro button.png Google button.png