Search results

Jump to navigation Jump to search
Results 1 – 10 of 10
Advanced search

Search in namespaces:

  
  
  
  
  
  
  
  
  
  
  • ...the rest of the borehole by one (bottom hole) or two (straddle) inflatable packers. The tester valve is opened, creating a pressure drop in the tool which suc ...match the IHP within 5 psi as a check of the tool's accuracy (assuming the packers did not leak).
    6 KB (997 words) - 17:55, 17 February 2022
  • ...well. The zone in question is sealed off from the rest of the wellbore by packers, and the formations' pressure and fluids are measured. Data obtained from a A drill stem test string consists of packers, a downhole shut-in valve, a safety joint, and pressure gauges ([[:file:dri
    26 KB (4,009 words) - 15:09, 24 January 2022
  • ...gram of (a) a casing-tubing dual completion and (b) a completion with dual packers and dual tubing strings.
    13 KB (1,944 words) - 19:56, 18 January 2022
  • ...gram of (a) a casing-tubing dual completion and (b) a completion with dual packers and dual tubing strings. ...e fluids from the wellbore. Information on Christmas trees, tubing spools, packers, and downhole equipment needed to produce the well should be carefully desi
    19 KB (2,910 words) - 21:06, 18 January 2022
  • * Isolating mechanical problems such as leaking pipes, leaking packers, and fluid movement in cement channels behind pipe
    12 KB (1,726 words) - 16:48, 20 January 2022
  • ...then running guns below the production packer become sufficient. Guns and packers can be operated on wireline, if assembly weight allows it. When operators c
    12 KB (1,786 words) - 21:02, 21 April 2022
  • Mechanical problems such as failures of the cement, tubulars, packers, wireline components, safety valves, or [[artificial lift]] equipment are a
    12 KB (1,834 words) - 15:25, 24 January 2022
  • ...urdon-tube recording pressure gauges, a set of flow valves, and one or two packers. The tool isolates the formation from the mud column in the annulus. When t
    14 KB (2,165 words) - 18:42, 20 January 2022
  • ...y prone to such failure is the tubing, casing, rod string, downhole pumps, packers, gas lift valves, and plugs in the well bore ([[:file:production-problems_f
    16 KB (2,540 words) - 18:41, 20 January 2022
  • ...ery 90106.</ref> The well was completed with an uncemented liner and swell packers with 11-stage stimulation every 152.4 m (500 ft), each with 49,895.16 kg (1
    97 KB (14,873 words) - 19:53, 11 January 2024