Search results

Jump to navigation Jump to search
  • ...ction engineers often design all equipment on the lease. After the oil and gas leaves the lease, pipeline or facilities engineers take over. The flow rate from either an oil well or a gas well can be easily estimated from the wellhead pressure if the wellhead pre
    9 KB (1,343 words) - 18:42, 20 January 2022
  • ...it fails in this last action, the fluid in the formation will displace the mud up the hole. This is called a kick. Should this hazardous situation not be ...d of the drill pipe, rotates, cutting and crushing the rock underneath it. Mud passes out through the nozzles in the drill bit, cools the bit, and acts to
    15 KB (2,385 words) - 15:05, 1 August 2016