Changes

Jump to navigation Jump to search
no edit summary
Line 20: Line 20:  
* A structure contour map on top of the reservoir.
 
* A structure contour map on top of the reservoir.
 
* An isopach map of the target reservoir—especially important if the reservoir displays significant stratigraphic thickness variation or has behaved in a ductile or compactive manner during deformation.
 
* An isopach map of the target reservoir—especially important if the reservoir displays significant stratigraphic thickness variation or has behaved in a ductile or compactive manner during deformation.
* Two or more structural cross sections incorporating all surface and subsurface control (wells and seismic) projected into the line of section in both the strike and dip directions.
+
* Two or more structural [[cross section]]s incorporating all surface and subsurface control (wells and seismic) projected into the line of section in both the strike and dip directions.
 
* Fault-surface maps (structural contours on the fault plane), made for all faults critical to closure at the top of the reservoir.
 
* Fault-surface maps (structural contours on the fault plane), made for all faults critical to closure at the top of the reservoir.
    
==Guidelines for making maps and sections==
 
==Guidelines for making maps and sections==
Follow these guidelines when making maps and cross sections of a structural play.
+
Follow these guidelines when making maps and [[cross section]]s of a structural play.
    
[[file:exploring-for-structural-traps_fig20-1.png|300px|thumb|{{figure number|1}}See text for explanation.]]
 
[[file:exploring-for-structural-traps_fig20-1.png|300px|thumb|{{figure number|1}}See text for explanation.]]
4,231

edits

Navigation menu