Changes

Jump to navigation Jump to search
Line 113: Line 113:  
{| class = "wikitable"
 
{| class = "wikitable"
 
|-
 
|-
! Step
+
! Step || Action
! Action
   
|-
 
|-
| 1
+
| 1 || Inspect the tool and check calibration before going in the hole.
| Inspect the tool and check calibration before going in the hole.
   
|-
 
|-
| 2
+
| 2 || Run quartz and strain gauges simultaneously. Record both readings independently. Normalize to one another after completing the survey.
| Run quartz and strain gauges simultaneously. Record both readings independently. Normalize to one another after completing the survey.
   
|-
 
|-
| 3
+
| 3 || Maintain a slight overflow of mud to keep the level in the borehole constant during the survey and to prevent mud hydrostatic pressure errors.
| Maintain a slight overflow of mud to keep the level in the borehole constant during the survey and to prevent mud hydrostatic pressure errors.
   
|-
 
|-
| 4
+
| 4 || Take mud hydrostatic pressures while descending into the hole to give the instruments time to equilibrate to changing temperature and pressure and to provide a mud hydrostatic pressure profile.
| Take mud hydrostatic pressures while descending into the hole to give the instruments time to equilibrate to changing temperature and pressure and to provide a mud hydrostatic pressure profile.
   
|-
 
|-
| 5
+
| 5 || Check for tool errors by calculating mud hydrostatic pressures at different depths from mud weight; check them against measured mud hydrostatic pressures at the same depths.
| Check for tool errors by calculating mud hydrostatic pressures at different depths from mud weight; check them against measured mud hydrostatic pressures at the same depths.
   
|}
 
|}
  

Navigation menu