M107FG3.jpg|{{figure number|3}}Simultaneous operations being conducted in Pinedale field with drilling, fracking, setting of surface pipe, and facilities installation all occurring concurrently. | M107FG3.jpg|{{figure number|3}}Simultaneous operations being conducted in Pinedale field with drilling, fracking, setting of surface pipe, and facilities installation all occurring concurrently. |