Difference between revisions of "Kickoff point"
Jump to navigation
Jump to search
m (Molyneux moved page Kickoff point (KOP) to Kickoff point) |
|||
Line 41: | Line 41: | ||
* [[Horizontal well]] | * [[Horizontal well]] | ||
* [[Lateral]] | * [[Lateral]] | ||
− | * [[Logging while drilling | + | * [[Logging while drilling]] |
− | * [[Measurement while drilling | + | * [[Measurement while drilling]] |
* [[Multilevel well]] | * [[Multilevel well]] | ||
* [[Multilateral well]] | * [[Multilateral well]] | ||
* [[Sidetrack]] | * [[Sidetrack]] | ||
* [[Toe]] | * [[Toe]] | ||
− | * [[Total measured length | + | * [[Total measured length]] |
==External links== | ==External links== |
Revision as of 21:18, 3 December 2015
Horizontal Wells: Focus on the Reservoir | |
Series | Methods in Exploration No. 14 |
---|---|
Chapter | Introduction |
Author | Timothy R. Carr, Erik P. Mason, Charles T Feazel |
Link | Web page |
Store | AAPG Store |
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.
This article is a stub. You can help AAPG Wiki by expanding it.
See also
- Bend
- Build rate
- Extended-reach wells
- Geosteering
- Heel
- Horizontal well
- Lateral
- Logging while drilling
- Measurement while drilling
- Multilevel well
- Multilateral well
- Sidetrack
- Toe
- Total measured length