Difference between revisions of "Kickoff point"
Jump to navigation
Jump to search
Cwhitehurst (talk | contribs) |
Cwhitehurst (talk | contribs) |
||
Line 20: | Line 20: | ||
{{stub}} | {{stub}} | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==See also== | ==See also== |
Latest revision as of 21:16, 15 March 2016
Horizontal Wells: Focus on the Reservoir | |
Series | Methods in Exploration No. 14 |
---|---|
Chapter | Introduction |
Author | Timothy R. Carr, Erik P. Mason, Charles T Feazel |
Link | Web page |
Store | AAPG Store |
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.
This article is a stub. You can help AAPG Wiki by expanding it.
See also
- Bend
- Build rate
- Extended-reach wells
- Geosteering
- Heel
- Horizontal well
- Lateral
- Logging while drilling
- Measurement while drilling
- Multilevel well
- Multilateral well
- Sidetrack
- Toe
- Total measured length