Changes

Jump to navigation Jump to search
m
Line 6: Line 6:  
  | part    = Critical elements of the petroleum system
 
  | part    = Critical elements of the petroleum system
 
  | chapter = Formation fluid pressure and its application
 
  | chapter = Formation fluid pressure and its application
  | frompg  = 5-1
+
  | frompg  = 5-33
  | topg    = 5-64
+
  | topg    = 5-35
 
  | author  = Edward A. Beaumont, Forrest Fiedler
 
  | author  = Edward A. Beaumont, Forrest Fiedler
 
  | link    = http://archives.datapages.com/data/specpubs/beaumont/ch05/ch05.htm
 
  | link    = http://archives.datapages.com/data/specpubs/beaumont/ch05/ch05.htm
Line 25: Line 25:  
{| class = "wikitable"
 
{| class = "wikitable"
 
|-
 
|-
! Consideration
+
! Consideration || RFTs || DSTs
! RFTs
  −
! DSTs
   
|-
 
|-
| Time to take one measurement
+
| Time to take one measurement || Less than 5 minutes for permeable formations || More than 90 minutes
| Less than 5 minutes for permeable formations
  −
| More than 90 minutes
   
|-
 
|-
| Drilling delay to run test
+
| Drilling delay to run test || About one logging run (wireline conveyed) || About equal to two trips with drillstring
| About one logging run (wireline conveyed)
  −
| About equal to two trips with drillstring
   
|-
 
|-
| Sampling interval
+
| Sampling interval || Small || Several feet or more; generally tests multiple flow units
| Small,
  −
| Several feet or more; generally tests multiple flow units
   
|-
 
|-
| Samples per run
+
| Samples per run || Many || Few
| Many
  −
| Few
   
|-
 
|-
| Expense per test
+
| Expense per test || Small || Large
| Small
  −
| Large
   
|-
 
|-
| Purpose of tool
+
| Purpose of tool || Pressure measurement || Fluid recovery and pressure
| Pressure measurement
  −
| Fluid recovery and pressure
   
|-
 
|-
| Survey problems
+
| Survey problems ||  
|  
   
* Getting good seat to measure pressure   
 
* Getting good seat to measure pressure   
 
* Screen plugging with material in drilling mud
 
* Screen plugging with material in drilling mud
   
|  
 
|  
 
* Packer failure   
 
* Packer failure   
 
* Depth determination
 
* Depth determination
   
|-
 
|-
| Fractured reservoir
+
| Fractured reservoir || May be unreliable || Good if fractures intersect wellbore
| May be unreliable
  −
| Good if fractures intersect wellbore
   
|-
 
|-
| Layered reservoir
+
| Layered reservoir || Not representative || Good if many layers are included in tested interval
| Not representative
  −
| Good if many layers are included in tested interval
   
|-
 
|-
| Skin damage
+
| Skin damage || Can be major error || Can be measured and corrected for
| Can be major error
  −
| Can be measured and corrected for
   
|}
 
|}
   Line 89: Line 66:     
==Operating an RFT survey==
 
==Operating an RFT survey==
The table below explains how to operate an RFT survey (see Gunter & Moore<ref name=ch05r9>Gunter, J., M., Moore, C., V., 1987, Improved use of wireline testers for reservoir evaluation: Journal of Petroleum Technology, p. 635–644.</ref>).
+
The list below explains how to operate an RFT survey (see Gunter & Moore<ref name=ch05r9>Gunter, J., M., Moore, C., V., 1987, Improved use of wireline testers for reservoir evaluation: Journal of Petroleum Technology, p. 635–644.</ref>).
   −
{| class = "wikitable"
+
# Use well logs to pick permeable zones for formation pressure measurements. Look for an invasion profile.
|-
+
# Plot mud hydrostatic and formation pressure at the well site to recognize anomalies or tool errors and to optimize station coverage.
! Step
+
# Occasionally repeat formation pressure measurements at the same depth to check for consistency.
! Action
+
# Repeat at some of the same depths for multiple surveys to help normalize the different surveys.
|-
+
# Sample both water- and hydrocarbon-bearing intervals to establish both the water and hydrocarbon pressure gradients.
| 1
+
# Plot pressures at the same scale as well logs to aid in interpretation.
| Use well logs to pick permeable zones for formation pressure measurements. Look for an invasion profile.
  −
|-
  −
| 2
  −
| Plot mud hydrostatic and formation pressure at the well site to recognize anomalies or tool errors and to optimize station coverage.
  −
|-
  −
| 3
  −
| Occasionally repeat formation pressure measurements at the same depth to check for consistency.
  −
|-
  −
| 4
  −
| Repeat at some of the same depths for multiple surveys to help normalize the different surveys.
  −
|-
  −
| 5
  −
| Sample both water- and hydrocarbon-bearing intervals to establish both the water and hydrocarbon pressure gradients.
  −
|-
  −
| 6
  −
| Plot pressures at the same scale as well logs to aid in interpretation.
  −
|}
      
==Controlling RFT quality==
 
==Controlling RFT quality==
The table below describes how to control RFT quality. For details, see Gunter & Moore.<ref name=ch05r9 />
+
The list below describes how to control RFT quality. For details, see Gunter & Moore.<ref name=ch05r9 />
   −
{| class = "wikitable"
+
# Inspect the tool and check calibration before going in the hole.
|-
+
# Run quartz and strain gauges simultaneously. Record both readings independently. Normalize to one another after completing the survey.
! Step
+
# Maintain a slight overflow of mud to keep the level in the borehole constant during the survey and to prevent mud hydrostatic pressure errors.
! Action
+
# Take mud hydrostatic pressures while descending into the hole to give the instruments time to equilibrate to changing temperature and pressure and to provide a mud hydrostatic pressure profile.
|-
+
# Check for tool errors by calculating mud hydrostatic pressures at different depths from mud weight; check them against measured mud hydrostatic pressures at the same depths.
| 1
  −
| Inspect the tool and check calibration before going in the hole.
  −
|-
  −
| 2
  −
| Run quartz and strain gauges simultaneously. Record both readings independently. Normalize to one another after completing the survey.
  −
|-
  −
| 3
  −
| Maintain a slight overflow of mud to keep the level in the borehole constant during the survey and to prevent mud hydrostatic pressure errors.
  −
|-
  −
| 4
  −
| Take mud hydrostatic pressures while descending into the hole to give the instruments time to equilibrate to changing temperature and pressure and to provide a mud hydrostatic pressure profile.
  −
|-
  −
| 5
  −
| Check for tool errors by calculating mud hydrostatic pressures at different depths from mud weight; check them against measured mud hydrostatic pressures at the same depths.
  −
|}
      
==See also==
 
==See also==
Line 154: Line 99:  
[[Category:Critical elements of the petroleum system]]  
 
[[Category:Critical elements of the petroleum system]]  
 
[[Category:Formation fluid pressure and its application]]
 
[[Category:Formation fluid pressure and its application]]
 +
[[Category:Treatise Handbook 3]]

Navigation menu