Changes

Jump to navigation Jump to search
no edit summary
Line 21: Line 21:  
* Locating sources downhole of undesired fluid phase production such as water entries
 
* Locating sources downhole of undesired fluid phase production such as water entries
 
* Isolating mechanical problems such as leaking pipes, leaking packers, and fluid movement in cement channels behind pipe
 
* Isolating mechanical problems such as leaking pipes, leaking packers, and fluid movement in cement channels behind pipe
* Evaluating the effectiveness of well treatment or workover operations by comparing the before and after job surveys
+
* Evaluating the effectiveness of well treatment or [[workover]] operations by comparing the before and after job surveys
 
* Accumulating baseline well performance information for comparison with later monitor surveys
 
* Accumulating baseline well performance information for comparison with later monitor surveys
 
* In EOR projects, maintaining injection efficiency by evaluating the injection profiles of individual wells in a field
 
* In EOR projects, maintaining injection efficiency by evaluating the injection profiles of individual wells in a field

Navigation menu