Changes

Jump to navigation Jump to search
28 bytes removed ,  16:29, 10 December 2013
Line 20: Line 20:     
==Problem prevention and correction==
 
==Problem prevention and correction==
[[:Image:able_dare-keelan-j-o-amaefule_rockwater-reaction_1.png|Table 1]] summarizes potential rock fluid reactions based on knowledge of clays present, damage prevention, and corrective procedures (Kersey, 1986)<ref name=Kersey_1986>Kersey, D. G., 1986, The role of petrographic analyses in the design of non-damaging drilling, completion, and [[stimulation]] programs: Society of Petroleum Engineers Paper No. 14089.</ref>. Prevention is preferred and, when possible, is likely to cost less than correction.
+
[[:Image:Table_rose_time-value-of-money_1.jpg|Table 1]] summarizes potential rock fluid reactions based on knowledge of clays present, damage prevention, and corrective procedures (Kersey, 1986)<ref name=Kersey_1986>Kersey, D. G., 1986, The role of petrographic analyses in the design of non-damaging drilling, completion, and [[stimulation]] programs: Society of Petroleum Engineers Paper No. 14089.</ref>. Prevention is preferred and, when possible, is likely to cost less than correction.
   −
[[File:table_dare-keelan-j-o-amaefule_rockwater-reaction_1.png|thumb|Rock-fluid potential problems, prevention, and corrective action]]
+
[[File:Table_rose_time-value-of-money_1.jpg|thumb|Table 1: Rock-fluid potential problems, prevention, and corrective action]]
    
===Laboratory tests===
 
===Laboratory tests===

Navigation menu