Changes

Jump to navigation Jump to search
36 bytes added ,  15:30, 31 March 2014
no edit summary
Line 109: Line 109:  
** Temperature requirements
 
** Temperature requirements
 
** Fresh, salt, or oil mud tools
 
** Fresh, salt, or oil mud tools
** Tool combinations and order of logging runs (usually gamma ray, deep resistivity, [[porosity]], sonic, pad-type resistivity, dipmeter, checkshot survey, and sidewall cores)
+
** Tool combinations and order of logging runs (usually [[Basic open hole tools#Gamma ray|gamma ray]], deep resistivity, [[porosity]], sonic, pad-type resistivity, dipmeter, checkshot survey, and sidewall cores)
 
** Backup tools
 
** Backup tools
 
** Calibration, both at surface (before and after logging) and downhole
 
** Calibration, both at surface (before and after logging) and downhole

Navigation menu