Changes

Jump to navigation Jump to search
Line 36: Line 36:     
==Smear gouge ratio (SGR)==
 
==Smear gouge ratio (SGR)==
Smear-gouge ratio is the ratio of sand to shale that has moved past some critical portion of the fault plane (Skerlec, 1996). Although not simply relatable to the shale gouge ratio, the smear gouge ratio varies in an inverse manner; i.e., high shale gouge ratio corresponds to low smear gouge ratio and vice versa.
+
Smear-gouge ratio is the ratio of sand to shale that has moved past some critical portion of the fault plane.<ref>Skerlec, G. M., 1996, Risking fault seal in the Gulf Coast (abs.): AAPG Annual Convention Program and Abstracts, v. 5,  p. A131.</ref> Although not simply relatable to the shale gouge ratio, the smear gouge ratio varies in an inverse manner; i.e., high shale gouge ratio corresponds to low smear gouge ratio and vice versa.
 
  −
 
  −
Skerlec, G. M., 1996, Risking fault seal in the Gulf Coast (abs.): AAPG Annual Convention Program and Abstracts, v. 5, 
  −
p. A131.
      
http://archives.datapages.com/data/bulletns/1997/06jun/0897/0897.htm?q=%2BauthorStrip%3Ayielding
 
http://archives.datapages.com/data/bulletns/1997/06jun/0897/0897.htm?q=%2BauthorStrip%3Ayielding

Navigation menu