Difference between revisions of "Bend"
Jump to navigation
Jump to search
(Created page with "{{publication | image = Methods14Cover.png | width = 120px | series = Methods in Exploration No. 14 | title = Horizontal Wells: Focus on the Reservoir | part =...") |
|||
Line 37: | Line 37: | ||
* [[Geosteering]] | * [[Geosteering]] | ||
* [[Heel]] | * [[Heel]] | ||
− | * [[Kickoff point | + | * [[Kickoff point]] |
* [[Lateral]] | * [[Lateral]] | ||
− | * [[Logging while drilling | + | * [[Logging while drilling]] |
− | * [[Measurement while drilling | + | * [[Measurement while drilling]] |
* [[Multilevel well]] | * [[Multilevel well]] | ||
* [[Multilateral well]] | * [[Multilateral well]] | ||
* [[Sidetrack]] | * [[Sidetrack]] | ||
* [[Toe]] | * [[Toe]] | ||
− | * [[Total measured length | + | * [[Total measured length]] |
==External links== | ==External links== |
Revision as of 21:11, 3 December 2015
Horizontal Wells: Focus on the Reservoir | |
Series | Methods in Exploration No. 14 |
---|---|
Chapter | Introduction |
Author | Timothy R. Carr, Erik P. Mason, Charles T Feazel |
Link | Web page |
Store | AAPG Store |
A bend (or curve) is the length of the horizontal well from the kickoff point to the heel, in which the well path is designed to change orientation from vertical or high-angle to horizontal.
This article is a stub. You can help AAPG Wiki by expanding it.
See also
- Horizontal well
- Build rate
- Extended-reach wells
- Geosteering
- Heel
- Kickoff point
- Lateral
- Logging while drilling
- Measurement while drilling
- Multilevel well
- Multilateral well
- Sidetrack
- Toe
- Total measured length