Search results
Jump to navigation
Jump to search
File:Drill-stem-testing fig8.png ...s run above the bottom packer because of a restricted flow area around the packer elements. (Types of gauge failures are described in Flopetrol-Johnston, 198(755 × 573 (6 KB)) - 22:25, 14 January 2014File:CT-HYDRO 1.png ..., hydraulic set and Straight pull shear release, single string retrievable packer. It can be used in the following applications: Production, Injection, and Z(1,920 × 1,079 (628 KB)) - 03:57, 18 June 2019File:Drill-stem-testing fig7.png Perfect chart. Blanked off gauge below the bottom packer on a straddle test. (A) running in hole; (B) initial flow period; (C) initi(728 × 559 (6 KB)) - 22:25, 14 January 2014File:Drill-stem-testing fig6.png ...initial buildup; (D) final flow period; (E) final buildup; and (F) release packer and pulling out of hole.(724 × 556 (6 KB)) - 22:25, 14 January 2014