Search results

Jump to navigation Jump to search
  • File:3.png
    ...ing facies association A and B, by Tomassini et al. (2014). A) mixed ramp. B) siliciclastic platform.
    (480 × 357 (68 KB)) - 16:50, 26 June 2015
  • File:DiapirDiagram.JPG
    ...contour map drawn on the J horizon. (c) Structure contour map drawn on the B horizon. From AAPG Bulletin, V. 91, No. 3 (March 2007), P. 343-363, by Hong
    (800 × 870 (270 KB)) - 17:59, 2 January 2015
  • File:GumelarFigure8.jpg
    ...xamples of leaks from a major structure. HCH in a) has a lower height than b). c) has a spill point value that is above the crest depth so that no leaka
    (870 × 540 (75 KB)) - 20:33, 28 October 2021
  • File:Fluid-contacts fig4.png
    .... Sharp changes in saturation correspond to elevations of facies changes. (b) Oil-water contact corresponding to capillary pressure curves. The free wat
    (1,924 × 933 (108 KB)) - 01:52, 14 January 2014
  • File:Fluid-contacts fig5.png
    ...on difference between contacts 1 and 2. The displacement pressure of fault B results in the elevation difference between contacts 1 and 3. The displacem
    (1,908 × 1,034 (76 KB)) - 01:52, 14 January 2014
  • File:Workovers fig5.png
    Wireline equipment, (a) Lubricator, (b) Typical string.
    (933 × 1,434 (53 KB)) - 21:50, 14 January 2014
  • File:Applied-paleontology fig17-29.png
    ...e adapted from Berggren et al., 1985a, <xref ref-type="bibr" rid="ch17r13">b}} ...e adapted from Berggren et al., 1985a, <xref ref-type="bibr" rid="ch17r13">b.
    (773 × 1,259 (209 KB)) - 16:03, 18 January 2014
  • File:M31F5.jpg
    ...its. From Deltaic environments of deposition, 1981, Coleman, J. M., and D. B. Prior, in AAPG Memoir 31.
    (1,152 × 941 (941 KB)) - 19:33, 15 August 2014
  • File:GumelarFigure9.jpg
    a) HCH from constant burial depth & b) using the formula Bretan, P. et al (2003).
    (828 × 316 (78 KB)) - 20:42, 28 October 2021
  • File:M31F2.jpg
    ...ons. From Deltaic environments of deposition, 1981, Coleman, J. M., and D. B. Prior, in AAPG Memoir 31.
    (365 × 772 (175 KB)) - 18:56, 15 August 2014
  • File:Wellbore-trajectory fig7.png
    (a) Packed bottom hole assembly, (b) Fulcrum effect for build angle.
    (900 × 1,089 (37 KB)) - 21:19, 14 January 2014
  • File:H4CH12FG11.JPG
    ...2012, Hicks, P. J. Jr., C. M. Fraticelli, J. D. Shosa, M. J. Hardy, and M. B. Townsley, in Peters, Kenneth E., David J. Curry, and Marek Kacewicz, eds.,
    (600 × 322 (73 KB)) - 21:40, 13 July 2015
  • File:Fishing fig7.png
    (a) Tapered mill, (b) Flat mill.
    (595 × 801 (17 KB)) - 01:50, 14 January 2014
  • File:Introduction-to-contouring-geological-data-with-a-computer fig1.png
    (a) Random points. (b) Clustered points.
    (947 × 524 (13 KB)) - 22:06, 13 January 2014
  • File:Seismic-data-acquisition-on-land fig5.png
    (a) Off end shooting. (b) Split spread shooting.
    (1,669 × 506 (9 KB)) - 16:16, 14 January 2014
  • File:Permeability fig4.png
    Schematic diagram of (a) steady-state and (b) unsteady-state apparatus.
    (934 × 647 (32 KB)) - 18:02, 14 January 2014
  • File:Mth14ch02f08.jpg
    ...Units A and B are not in fluid communication with each other, Units A and B appear to represent separate reservoir compartments (Suhas Talukdar, Core L
    (400 × 465 (28 KB)) - 20:19, 4 December 2015
  • File:Core-alteration-and-preservation fig1.png
    {{copyright|reservoir to surface. (a)Oil-productive formation. (b) Gas-productive formation. (Courtesy of Core Laboratories, a Division of We ...d contents. Copyright: reservoir to surface. (a)Oil-productive formation. (b) Gas-productive formation. (Courtesy of Core Laboratories, a Division of We
    (1,954 × 1,054 (65 KB)) - 22:38, 13 January 2014
  • File:Seismic-migration fig6.png
    (a) Unmigrated and (b) migrated stack of DMO-processed data from the Gulf of Mexico.
    (1,007 × 1,114 (690 KB)) - 19:35, 14 January 2014
  • File:Production-logging fig4.png
    Two types of flowmeters, (a) Full bore flowmeter, (b) Diverting basket type flowmeter.
    (1,963 × 1,194 (48 KB)) - 16:37, 14 January 2014

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)