Changes

Jump to navigation Jump to search
no edit summary
Line 9: Line 9:  
* Permit procedures for fracturing within fresh-water aquifer zones (mostly undertaken in support of methane production from [[coal]] beds) should be designed on a basin-by-basin and state-by-state basis.
 
* Permit procedures for fracturing within fresh-water aquifer zones (mostly undertaken in support of methane production from [[coal]] beds) should be designed on a basin-by-basin and state-by-state basis.
 
* Permitting agencies should bear in mind in each instance the wide variety of possible designs of [[fracture]] treatments, and the geologic relationships of reservoir beds and aquifers unique to each area.
 
* Permitting agencies should bear in mind in each instance the wide variety of possible designs of [[fracture]] treatments, and the geologic relationships of reservoir beds and aquifers unique to each area.
 +
 +
==See also==
 +
* [[White paper: Hydraulic fracturing]], which includes an annotated bibliography

Navigation menu