Changes

Jump to navigation Jump to search
Line 287: Line 287:  
===Stage 6. Applications studies===
 
===Stage 6. Applications studies===
   −
Depending on the objectives of the study being conducted, the geologist needs to generate additional maps, cross sections, fence diagrams, or simulation models. For the purposes of reserve estimation, net pay maps are needed (see [[Effective pay determination]]). If the major controls on net pay distribution are diagenetic in nature, contouring of net pay maps should be guided by trends present on contour maps of major diagenetic components. Average porosity maps should also be “guided” in this same fashion. Where simulation of fluid flow behavior is the object of the study, the geologist must assist in the preparation of a three-dimensional simulation model.
+
Depending on the objectives of the study being conducted, the geologist needs to generate additional maps, [[cross section]]s, fence diagrams, or simulation models. For the purposes of reserve estimation, net pay maps are needed (see [[Effective pay determination]]). If the major controls on net pay distribution are diagenetic in nature, contouring of net pay maps should be guided by trends present on contour maps of major diagenetic components. Average porosity maps should also be “guided” in this same fashion. Where simulation of fluid flow behavior is the object of the study, the geologist must assist in the preparation of a three-dimensional simulation model.
    
===Stage 7. Model testing and revision===
 
===Stage 7. Model testing and revision===
4,231

edits

Navigation menu