Revision history of "File:Drill-stem-testing fig6.png"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 22:25, 14 January 2014Importer talk contribs 358 bytes +358 Perfect chart. Gauges inside above and outside below the closing tool. Pressure transient analysis done from these gauges. (A) Run in hole, gauge measuring hydrostatic pressure of mud column; (B) initial flow period; (C) initial buildup; (D) final flow...