Revision history of "File:Figure2EagleFord2019-20CommRept.jpg"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 21:54, 6 April 2021Molyneux talk contribs 211 bytes +211 Top: Eagle Ford wells with production in IHS Enerdeq from May 2019 through May 2020 (accessed May 27, 2020). Bottom: rig counts in the Eagle Ford from May 2019 through November 2020 (source: Baker Hughes, 2020).