Revision history of "File:M91Ch2.JPG"

Jump to navigation Jump to search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 21:14, 22 April 2015Molyneux talk contribs 385 bytes +385 When a perforated liner completion is run, the reservoir interval is first isolated from the wellbore by the cemented liner. The liner is then selectively perforated with holes so as to allow fluid to flow into the wellbore from the specific zones requ...