File:M91Ch2.JPG
Revision as of 21:14, 22 April 2015 by Molyneux (talk | contribs) (When a perforated liner completion is run, the reservoir interval is first isolated from the wellbore by the cemented liner. The liner is then selectively perforated with holes so as to allow fluid to flow into the wellbore from the specific zones requ...)
Size of this preview: 577 × 599 pixels. Other resolutions: 231 × 240 pixels | 800 × 831 pixels.
Original file (800 × 831 pixels, file size: 175 KB, MIME type: image/jpeg)
When a perforated liner completion is run, the reservoir interval is first isolated from the wellbore by the cemented liner. The liner is then selectively perforated with holes so as to allow fluid to flow into the wellbore from the specific zones required for production. From Shepherd, M., 2009, Drilling a well, in M. Shepherd, Oil field production geology: AAPG Memoir 91, p. 7-12.
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Thumbnail | Dimensions | User | Comment | |
---|---|---|---|---|---|
current | 21:14, 22 April 2015 | 800 × 831 (175 KB) | Molyneux (talk | contribs) | When a perforated liner completion is run, the reservoir interval is first isolated from the wellbore by the cemented liner. The liner is then selectively perforated with holes so as to allow fluid to flow into the wellbore from the specific zones requ... |
You cannot overwrite this file.
File usage
The following page uses this file: