Difference between revisions of "Kickoff point"

From AAPG Wiki
Jump to navigation Jump to search
(Created page with "{{publication | image = Methods14Cover.png | width = 120px | series = Methods in Exploration No. 14 | title = Horizontal Wells: Focus on the Reservoir | part =...")
 
m (Molyneux moved page Kickoff point (KOP) to Kickoff point)
(No difference)

Revision as of 21:15, 3 December 2015

Horizontal Wells: Focus on the Reservoir
Series Methods in Exploration No. 14
Chapter Introduction
Author Timothy R. Carr, Erik P. Mason, Charles T Feazel
Link Web page
Store AAPG Store
Simple vertical profile of a horizontal well, illustrating basic terms.

The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.



This article is a stub. You can help AAPG Wiki by expanding it.





See also

External links

find literature about
Kickoff point
Datapages button.png GeoScienceWorld button.png OnePetro button.png Google button.png