Difference between revisions of "Kickoff point"

From AAPG Wiki
Jump to navigation Jump to search
(Created page with "{{publication | image = Methods14Cover.png | width = 120px | series = Methods in Exploration No. 14 | title = Horizontal Wells: Focus on the Reservoir | part =...")
 
 
(5 intermediate revisions by 2 users not shown)
Line 14: Line 14:
 
  | isbn    = 0891816658
 
  | isbn    = 0891816658
 
}}
 
}}
 
[[file:Mth14ch00f01.jpg|thumb|left|300px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
 
  
 
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
 
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
  
 
+
[[file:Mth14ch00f01.jpg|thumb|center|500px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
 
 
  
 
{{stub}}
 
{{stub}}
 
 
 
 
 
 
 
 
  
 
==See also==
 
==See also==
Line 41: Line 30:
 
* [[Horizontal well]]
 
* [[Horizontal well]]
 
* [[Lateral]]
 
* [[Lateral]]
* [[Logging while drilling (LWD)]]
+
* [[Logging while drilling]]
* [[Measurement while drilling (MWD)]]
+
* [[Measurement while drilling]]
 
* [[Multilevel well]]
 
* [[Multilevel well]]
 
* [[Multilateral well]]
 
* [[Multilateral well]]
 
* [[Sidetrack]]
 
* [[Sidetrack]]
 
* [[Toe]]
 
* [[Toe]]
* [[Total measured length (TML)]]
+
* [[Total measured length]]
  
 
==External links==
 
==External links==

Latest revision as of 21:16, 15 March 2016

Horizontal Wells: Focus on the Reservoir
Series Methods in Exploration No. 14
Chapter Introduction
Author Timothy R. Carr, Erik P. Mason, Charles T Feazel
Link Web page
Store AAPG Store

The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.

Simple vertical profile of a horizontal well, illustrating basic terms.

This article is a stub. You can help AAPG Wiki by expanding it.

See also

External links

find literature about
Kickoff point
Datapages button.png GeoScienceWorld button.png OnePetro button.png Google button.png