Changes

Jump to navigation Jump to search
27 bytes removed ,  21:16, 15 March 2016
no edit summary
Line 14: Line 14:  
  | isbn    = 0891816658
 
  | isbn    = 0891816658
 
}}
 
}}
  −
[[file:Mth14ch00f01.jpg|thumb|left|300px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
      
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
 
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
   −
 
+
[[file:Mth14ch00f01.jpg|thumb|center|500px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
 
      
{{stub}}
 
{{stub}}
  −
  −
  −
  −
  −
  −
  −
      
==See also==
 
==See also==
Line 41: Line 30:  
* [[Horizontal well]]
 
* [[Horizontal well]]
 
* [[Lateral]]
 
* [[Lateral]]
* [[Logging while drilling (LWD)]]
+
* [[Logging while drilling]]
* [[Measurement while drilling (MWD)]]
+
* [[Measurement while drilling]]
 
* [[Multilevel well]]
 
* [[Multilevel well]]
 
* [[Multilateral well]]
 
* [[Multilateral well]]
 
* [[Sidetrack]]
 
* [[Sidetrack]]
 
* [[Toe]]
 
* [[Toe]]
* [[Total measured length (TML)]]
+
* [[Total measured length]]
    
==External links==
 
==External links==

Navigation menu