Difference between revisions of "Kickoff point"

From AAPG Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:
 
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
 
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the [[build]] [[bend (curve)|curve]].
  
[[file:Mth14ch00f01.jpg|thumb|center|300px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
+
[[file:Mth14ch00f01.jpg|thumb|center|500px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
  
 
{{stub}}
 
{{stub}}
 
 
 
 
 
 
 
 
  
 
==See also==
 
==See also==

Latest revision as of 21:16, 15 March 2016

Horizontal Wells: Focus on the Reservoir
Series Methods in Exploration No. 14
Chapter Introduction
Author Timothy R. Carr, Erik P. Mason, Charles T Feazel
Link Web page
Store AAPG Store

The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.

Simple vertical profile of a horizontal well, illustrating basic terms.

This article is a stub. You can help AAPG Wiki by expanding it.

See also

External links

find literature about
Kickoff point
Datapages button.png GeoScienceWorld button.png OnePetro button.png Google button.png