Kickoff point
Revision as of 21:15, 3 December 2015 by Molyneux (talk | contribs) (Molyneux moved page Kickoff point (KOP) to Kickoff point)
Horizontal Wells: Focus on the Reservoir | |
Series | Methods in Exploration No. 14 |
---|---|
Chapter | Introduction |
Author | Timothy R. Carr, Erik P. Mason, Charles T Feazel |
Link | Web page |
Store | AAPG Store |
The kickoff point (KOP) is the location in a vertical wellbore or inclined section of a slant well where directional drilling operations commence in order to build the wellbore to the design orientation. The KOP defines the beginning of the build curve.
This article is a stub. You can help AAPG Wiki by expanding it.
See also
- Bend
- Build rate
- Extended-reach wells
- Geosteering
- Heel
- Horizontal well
- Lateral
- Logging while drilling (LWD)
- Measurement while drilling (MWD)
- Multilevel well
- Multilateral well
- Sidetrack
- Toe
- Total measured length (TML)