The ability to operate year round within a concentrated development area benefits industry, the environment, the people of Wyoming, and wildlife. It provides continuity to operations that leads to efficient application of technology, which allows operators to drill more wells per rig with less emissions per well, and to fully develop the resource. It also makes it feasible to use the latest technologies to reduce emissions such as installing LGSs, applying selective catalytic reduction (SCR) devices to rig engines to reduce emissions of nitrogen oxides to near zero, and consolidating production facilities. Continuity of operations also promotes a stable workforce with steady employment and a consistent tax revenue stream for the state of Wyoming.
 
The ability to operate year round within a concentrated development area benefits industry, the environment, the people of Wyoming, and wildlife. It provides continuity to operations that leads to efficient application of technology, which allows operators to drill more wells per rig with less emissions per well, and to fully develop the resource. It also makes it feasible to use the latest technologies to reduce emissions such as installing LGSs, applying selective catalytic reduction (SCR) devices to rig engines to reduce emissions of nitrogen oxides to near zero, and consolidating production facilities. Continuity of operations also promotes a stable workforce with steady employment and a consistent tax revenue stream for the state of Wyoming.
   −
The continuity provided by year-round access led to significant performance improvements in drilling and completion efficiencies. Average drilling times have dropped from more than 60 days per well in the early 2000s to less than 12 days per well in 2013. In recent years, some wells have even been drilled to depths of over 14,000 ft (4300 m) in less than nine days (Figure 2).
+
The continuity provided by year-round access led to significant performance improvements in drilling and completion efficiencies. Average drilling times have dropped from more than 60 days per well in the early 2000s to less than 12 days per well in 2013. In recent years, some wells have even been drilled to depths of over 14,000 ft (4300 m) in less than nine days ([[:File:M107FG2.jpg|Figure 2]]).
    
The decline in drill times can be attributed to a number of factors including fit-for-purpose rigs, improved drill-bit technology, drilling wells with oil-based mud instead of water-based mud, consistently trained and experienced crews, use of down-hole mud-motors and steerable assemblies, new slim-hole well designs, multiwell pad drilling, and removing steps from the critical path of the drilling rig. Similar performance gains have been seen on the completions side where wells once took more than a month to complete. Now a pair of wells can be completely fracked with over 20 frack stages per well within four or five days. These efficiencies have given Pinedale operators a cost advantage that has expanded the economic limits of the field and allowed for full field development through high density drilling.
 
The decline in drill times can be attributed to a number of factors including fit-for-purpose rigs, improved drill-bit technology, drilling wells with oil-based mud instead of water-based mud, consistently trained and experienced crews, use of down-hole mud-motors and steerable assemblies, new slim-hole well designs, multiwell pad drilling, and removing steps from the critical path of the drilling rig. Similar performance gains have been seen on the completions side where wells once took more than a month to complete. Now a pair of wells can be completely fracked with over 20 frack stages per well within four or five days. These efficiencies have given Pinedale operators a cost advantage that has expanded the economic limits of the field and allowed for full field development through high density drilling.
   −
Simultaneous operations (SIMOPS) are also now being done by all the major operators in Pinedale field with drilling, hydraulic fracturing, and facilities installations occurring at the same time (Figure 3). In order to fully develop the resource, wells are being drilled on dense spacing of as little as five acres per well. This makes Pinedale field one of the first places with such high-density pad drilling. Well bores are gently S-shaped and are drilled on pads to reduce the surface disturbance, which allows the development of a relatively large subsurface volume from a relatively small surface area (Figure 4).
+
Simultaneous operations (SIMOPS) are also now being done by all the major operators in Pinedale field with drilling, hydraulic fracturing, and facilities installations occurring at the same time ([[:File:M107FG3.jpg|Figure 3]]). In order to fully develop the resource, wells are being drilled on dense spacing of as little as five acres per well. This makes Pinedale field one of the first places with such high-density pad drilling. Well bores are gently S-shaped and are drilled on pads to reduce the surface disturbance, which allows the development of a relatively large subsurface volume from a relatively small surface area ([[:File:M107FG4.jpg|Figure 4]]).
    