Changes

Jump to navigation Jump to search
m
Line 73: Line 73:     
# Enter [[:file:predicting-reservoir-system-quality-and-performance_fig9-34.png|Figure 3]] with R<sub>mf</sub> at formation temperature on the vertical axis.
 
# Enter [[:file:predicting-reservoir-system-quality-and-performance_fig9-34.png|Figure 3]] with R<sub>mf</sub> at formation temperature on the vertical axis.
# Move across the chart to the appropriate formation temperature contour, and mark this point on the figure.
+
# Move across the chart to the appropriate formation temperature [[contour]], and mark this point on the figure.
 
# Read down to R<sub>mf</sub><sub>eq</sub> . This value is used in the equation R<sub>we</sub> = R<sub>mf</sub><sub>eq</sub> (R<sub>mf</sub><sub>eq</sub> /R<sub>we</sub> value).
 
# Read down to R<sub>mf</sub><sub>eq</sub> . This value is used in the equation R<sub>we</sub> = R<sub>mf</sub><sub>eq</sub> (R<sub>mf</sub><sub>eq</sub> /R<sub>we</sub> value).
   Line 106: Line 106:  
[[Category:Predicting the occurrence of oil and gas traps]]  
 
[[Category:Predicting the occurrence of oil and gas traps]]  
 
[[Category:Predicting reservoir system quality and performance]]
 
[[Category:Predicting reservoir system quality and performance]]
 +
[[Category:Treatise Handbook 3]]

Navigation menu