Changes

Jump to navigation Jump to search
Line 16: Line 16:  
==Mud weight and pore pressure==
 
==Mud weight and pore pressure==
   −
The mud weight needed to control a well reflects pore pressure of any permeable formations drilled. To control a well, operators generally use a mud weight that will exert a pressure close to the expected pore pressure. When drilling mud kicks or blows out, the pressure from the mud is less than, but usually close to, pore pressure.
+
The [[Drilling fluid|mud weight]] needed to control a well reflects [http://www.glossary.oilfield.slb.com/en/Terms/p/pore_pressure.aspx pore pressure] of any permeable formations drilled. To control a well, operators generally use a mud weight that will exert a pressure close to the expected pore pressure. When drilling mud kicks or [[Pressure_detection#Drilling_problems_with_overpressured_reservoirs|blows out]], the pressure from the mud is less than, but usually close to, pore pressure.
    
==Calculating pressure from mud weight==
 
==Calculating pressure from mud weight==
4,231

edits

Navigation menu