Changes

Jump to navigation Jump to search
Line 60: Line 60:  
[[file:predicting-reservoir-system-quality-and-performance_fig9-39.png|300px|thumb|{{figure number|4}}An example of plotting the lower percentages of S<sub>w</sub>.]]
 
[[file:predicting-reservoir-system-quality-and-performance_fig9-39.png|300px|thumb|{{figure number|4}}An example of plotting the lower percentages of S<sub>w</sub>.]]
   −
After plotting the 100% S<sub>w</sub> line, plot the lines representing lower percentages of S<sub>w</sub> using this procedure.
+
After plotting the 100% S<sub>w</sub> line, plot the lines representing lower percentages of S<sub>w</sub> using this procedure:
   −
{| class = "wikitable"
+
# Find the intercept of R<sub>t</sub> = 1 and the 100% S<sub>w</sub> line (made in the last procedure).
|-
+
# From this intercept, draw a line parallel to the x-axis across the plot. Any point on this line has the same porosity.
! Step || Action
+
# Where this line passes through R<sub>t</sub> of 2, 4, 6, 8, 14, and 20, draw a series of lines parallel to the 100% S<sub>w</sub> line.
|-
+
# Points on these lines correspond to S<sub>w</sub> of 71, 50, 41, 35, 27, and 22%. These percentages are calculated from the Archie equation using ''m'' = 2 and ''n'' = 2 at R<sub>t</sub> of 2, 4, 6, 8, 14, and 20.
| 1 || Find the intercept of R<sub>t</sub> = 1 and the 100% S<sub>w</sub> line (made in the last procedure).
  −
|-
  −
| 2 || From this intercept, draw a line parallel to the x-axis across the plot. Any point on this line has the same porosity.
  −
|-
  −
| 3 || Where this line passes through R<sub>t</sub> of 2, 4, 6, 8, 14, and 20, draw a series of lines parallel to the 100% S<sub>w</sub> line.
  −
|-
  −
| 4 || Points on these lines correspond to S<sub>w</sub> of 71, 50, 41, 35, 27, and 22%. These percentages are calculated from the Archie equation using ''m'' = 2 and ''n'' = 2 at R<sub>t</sub> of 2, 4, 6, 8, 14, and 20.
  −
|}
      
[[:file:predicting-reservoir-system-quality-and-performance_fig9-39.png|Figure 4]] is an example of following this procedure.
 
[[:file:predicting-reservoir-system-quality-and-performance_fig9-39.png|Figure 4]] is an example of following this procedure.

Navigation menu