− | [[file:Mth14ch00f01.jpg|thumb|left|300px|Simple vertical profile of a horizontal well, illustrating basic terms.]]
| + | Build rate is the rate, measured in degrees per unit length, at which the well path of a [[horizontal well]] moves through the bend (curve) from vertical or high-angle to the desired low-angle or horizontal attitude. |