Changes

Jump to navigation Jump to search
no edit summary
Line 24: Line 24:  
* Well must penetrate above critical elements in a more fracturable (more calcareous) bench within the Niobrara
 
* Well must penetrate above critical elements in a more fracturable (more calcareous) bench within the Niobrara
 
* Completion must be [[Well completions#Open hole completions|open hole]] (hang a [[Well completions#Liner completions|slotted liner]]) with cement-block fractures
 
* Completion must be [[Well completions#Open hole completions|open hole]] (hang a [[Well completions#Liner completions|slotted liner]]) with cement-block fractures
* Drilling must be conducted with underbalanced mud or air to prevent fracture damage. The Niobrara is an underpressured reservoir with petrostatic (0.33 lb/ft gradient) rather than hydrostatic (0.43 lb/ft gradient) pressure.
+
* Drilling must be conducted with [[Analysis of mud weights|underbalanced mud]] or air to prevent fracture damage. The Niobrara is an underpressured reservoir with petrostatic (0.33 lb/ft gradient) rather than hydrostatic (0.43 lb/ft gradient) pressure.
    
==Applying the critical factors==
 
==Applying the critical factors==
4,231

edits

Navigation menu