Changes

Jump to navigation Jump to search
200 bytes removed ,  22:41, 6 April 2014
Line 43: Line 43:     
The ''[[catwalk]]'' is the deck located to the side of the derrick floor and between the pipe racks (22). Joints of drill pipe and casing are rolled from the pipe racks where they are stored on the catwalk and hoisted up through the [[slide]] (21) and [[V-door]]. The catwalk is also the primary location to process [[Core handling|core]] and assemble [[Basic tool table|wireline logging tools]].
 
The ''[[catwalk]]'' is the deck located to the side of the derrick floor and between the pipe racks (22). Joints of drill pipe and casing are rolled from the pipe racks where they are stored on the catwalk and hoisted up through the [[slide]] (21) and [[V-door]]. The catwalk is also the primary location to process [[Core handling|core]] and assemble [[Basic tool table|wireline logging tools]].
  −
[[file:land-rigs_fig2.png|thumb|{{figure number|2}}Circulating system of a rig. (From <ref name=pt03r50>Whittaker, A., ed., 1985, Field geologists training guide: Boston, MA, IHRDC, 291 p.</ref>.)]]
      
==Circulating system==
 
==Circulating system==

Navigation menu