Changes

Jump to navigation Jump to search
no edit summary
Line 30: Line 30:  
| 2
 
| 2
 
| Collect observations
 
| Collect observations
| Collecting outcrop, seismic, and well log data
+
| Collecting outcrop, [[Seismic data|seismic]], and well log data
 
|-
 
|-
 
| 3
 
| 3
 
| Formulate hypothesis
 
| Formulate hypothesis
| Correlating seismic records with well logs Contouring structural and thickness data
+
| Correlating seismic records with well logs [[Contour]]ing structural and thickness data
 
|-
 
|-
 
| 4
 
| 4
Line 42: Line 42:  
| 5
 
| 5
 
| Test predictions by observing phenomena
 
| Test predictions by observing phenomena
| Seismically detailing a structural prospect Drilling a wildcat well
+
| Seismically detailing a structural prospect Drilling a [[wildcat]] well
 
|-
 
|-
 
| 6
 
| 6
4,231

edits

Navigation menu