Changes

Jump to navigation Jump to search
no edit summary
Line 26: Line 26:  
* During '''shut-in periods''', the packer(s) is still inflated and the tester valve is closed. Ideally, pressure in the closed tool gradually builds up until it reaches equilibrium with the pressure of the isolated formation.
 
* During '''shut-in periods''', the packer(s) is still inflated and the tester valve is closed. Ideally, pressure in the closed tool gradually builds up until it reaches equilibrium with the pressure of the isolated formation.
   −
[[:file:formation-fluid-pressure-and-its-application_fig5-13.png|figure 1]] shows a typical DST tool, the configurations of the tool during a DST, and the periods of a DST.
+
[[:file:formation-fluid-pressure-and-its-application_fig5-13.png|Figure 1]] shows a typical DST tool, the configurations of the tool during a DST, and the periods of a DST.
    
==A DST plot==
 
==A DST plot==

Navigation menu