Changes

Jump to navigation Jump to search
Line 26: Line 26:     
* Base map preparation
 
* Base map preparation
 
+
**Projection system
<list-item>Projection system</list-item><list-item>Project size</list-item><list-item>Seismic data files</list-item><list-item>Well data files</list-item><list-item>Cultural information files</list-item>
+
**Project size
 +
**Seismic data files
 +
**Well data files
 +
**Cultural information files
 
* Seismic preparation
 
* Seismic preparation
 
+
**Datum reference plane
<list-item>Datum reference plane</list-item><list-item>Polarity and phase convention</list-item><list-item>Trace amplitude scaling</list-item><list-item>Trace balancing</list-item><list-item>Storage format</list-item>
+
**Polarity and phase convention
 +
**Trace amplitude scaling
 +
**Trace balancing
 +
**Storage format
 
* Geological preparation
 
* Geological preparation
 
+
**Well data, such as curves, tops, and lithology
<list-item>Well data, such as curves, tops, and lithology</list-item><list-item>Modeling</list-item><list-item>Velocity information</list-item>
+
**Modeling
 +
**Velocity information
    
===Base map preparation===
 
===Base map preparation===

Navigation menu