file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole. | file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole. |