Changes

Jump to navigation Jump to search
No change in size ,  14:00, 13 May 2014
Line 79: Line 79:  
{{clear}}
 
{{clear}}
 
==Analyzing the DST==
 
==Analyzing the DST==
<gallery mode=packed widths=300>
+
<gallery mode=packed widths=400>
 
file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.
 
file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.
 
file:drill-stem-testing_fig4.png|{{figure number|4}}Collar leak. Gauge located inside and above the closing tool. Chart indicates increasing pressure during running in hole and shut-in periods.
 
file:drill-stem-testing_fig4.png|{{figure number|4}}Collar leak. Gauge located inside and above the closing tool. Chart indicates increasing pressure during running in hole and shut-in periods.

Navigation menu