Changes

Jump to navigation Jump to search
Line 80: Line 80:     
==Analyzing the DST==
 
==Analyzing the DST==
<gallery mode=packed>
+
<gallery heights=300px>
 
file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.
 
file:drill-stem-testing_fig3.png|{{figure number|3}}Perfect chart. Gauge located inside and above the closing tool. (A) Add cushion/run in hole; (B) initial flow period; (C) initial shut-in period; (D) final flow period; (E) final shut-in period; and (F) pulling out of hole.
 
file:drill-stem-testing_fig4.png|{{figure number|4}}Collar leak. Gauge located inside and above the closing tool. Chart indicates increasing pressure during running in hole and shut-in periods.
 
file:drill-stem-testing_fig4.png|{{figure number|4}}Collar leak. Gauge located inside and above the closing tool. Chart indicates increasing pressure during running in hole and shut-in periods.

Navigation menu