Changes

Jump to navigation Jump to search
4 bytes added ,  20:33, 16 July 2014
Line 134: Line 134:  
:<math>\mbox{gas--oil tilt}    = 1.0/(1.0 - 0.15) \times 17 = 20 \mbox{ ft/mi}</math>
 
:<math>\mbox{gas--oil tilt}    = 1.0/(1.0 - 0.15) \times 17 = 20 \mbox{ ft/mi}</math>
   −
The fluid contacts are graphically projected away from well B at the calculated dips to determine the contact elevations along the cross section.
+
The fluid contacts are graphically projected away from well B at the calculated dips to determine the contact elevations along the [[cross section]].
    
===Reservoir heterogeneity===
 
===Reservoir heterogeneity===
4,231

edits

Navigation menu