Search results
Jump to navigation
Jump to search
- ...g. A typical jarring set up would include a catching tool, bumper jar, oil jar, drill collars, and drill string. Drilling jars (specially strengthened jar8 KB (1,156 words) - 21:19, 19 January 2022
- * Do not rotate, bump, or jar the inner barrel while laying down the core or cutting it into sections.7 KB (1,083 words) - 20:50, 19 January 2022
- ...ut. The faster a sample is examined, wrapped, and sealed either in a glass jar or a ProtecCore® sleeve, the more accurate the fluid saturation analysis w7 KB (1,100 words) - 21:16, 19 January 2022
- ...e with a wet system has a high cost and requires regular maintenance. Each jar must be purged with nitrogen every two weeks.20 KB (2,971 words) - 15:46, 19 January 2022