Changes

Jump to navigation Jump to search
Line 30: Line 30:     
==Multiple completions==
 
==Multiple completions==
 +
<gallery mode=packed heights=200px widths=200px>
 +
Well-completions_fig4.png|'''Figure 4.''' Wellbore diagram of (a) a casing-tubing dual completion and (b) a completion with dual packers and dual tubing strings.
 +
Well-completions_fig5.png|'''Figure 5.''' Wellbore diagram of a conventional triple completion.
 +
</gallery>
   −
[[File:Well-completions_fig4.png|thumb|left|'''Figure 4.''' Wellbore diagram of (a) a casing-tubing dual completion and (b) a completion with dual packers and dual tubing strings.]]
+
In certain cases, multiple completions may provide the best control of reservoir operations. Multiple completions include the [[tubing-casing dual]], [[dual tubing strings]], and the typical triple completion consisting of three tubing strings. [[:File:Well-completions_fig4.png| Figures 4]] and [[:File:Well-completions_fig5.png|5]] illustrate these multiple completions.
   −
In certain cases, multiple completions may provide the best control of reservoir operations. Multiple completions include the [[tubing-casing dual]], [[dual tubing strings]], and the typical triple completion consisting of three tubing strings. Figures [[:File:Well-completions_fig4.png|4]] and [[:File:Well-completions_fig5.png|5]] illustrate these multiple completions.
  −
  −
[[File:Well-completions_fig5.png|thumb|'''Figure 5.''' Wellbore diagram of a conventional triple completion.]]
      
The more complex the completion, the more trouble one can expect in both completion operations and in subsequent [[Workovers|workover operations]]. Multiple completions should be considered only in special situations. These situations include areas where [[drilling costs]] are very high or where the area allocated for drilling wells is at a premium. Such areas include offshore areas, highly populated areas, and remote land locations.
 
The more complex the completion, the more trouble one can expect in both completion operations and in subsequent [[Workovers|workover operations]]. Multiple completions should be considered only in special situations. These situations include areas where [[drilling costs]] are very high or where the area allocated for drilling wells is at a premium. Such areas include offshore areas, highly populated areas, and remote land locations.

Navigation menu